concrete precision rainy weather

During monsoon season we need to keep below points in mind while concreting



  1. Slump should be no more than 120. If pipeline is long , at pump slump can be 150 max
  2. If it’s raining , avoid casting as at batching plant it becomes very difficult to get idea of moisture in raw material and change water correction in recipe .
  3. Cube casting should be under shade area where water does not fall continuously
  4. If there are multiple grades in slab , please make sure marking on cubes don’t get interchanged . For this please designate separate area for different grade of cube casting .
  5. On site when cubes are kept , please see if someone do not put foot on cubes and cubes are secured in a safe place where there is no damage to cubes as these are samples who represent quality of concrete .
  6. During monsoon , we observe that due to continuous moisture in air , cubes are moist and even in 7 days contains moisture if proper heat or temperature is not met . In these cases , we recommend to do 7 days , 14 days , 21 days and 28 days cube testing . Get extra cubes filled .
  7. If 7 day strength is critical , please contact us so we will Suggest a revision in recipe According to your need . Or you can choose One higher grade of concrete for monsoon season .
  8. Cover your structure immediately after casting . But also make sure structure gets appropriate air flow .
  9. Check structure next day after 24 hours to make sure structure is looking good .
  10. If due rain or distorted water proportion , concrete gets segregated then don’t use that concrete for structure Or any other questions we are just comment below.

Happy monsoon and happy concreting !!!

Comments

Popular posts from this blog

Happy Holi 2021: Top Wishes, Messages, Quotes and Images to share with your loved ones

Movies..!

M Sand Vs River Sand

Standard Consistency Test - Test on Cement

Honeycomb in concrete – Evade and Rectification